Hi,
I need some advice on the best way to migrate my customer from Rio 8.3.1 to 9.1 — they are moving to a new box at the same time.
The customer is currently running Rio 8.3.1 with Workflow on a Windows Server 2003 machine — since Workflow cannot run on Windows 2003, we have a new box with Windows 2012 R2.
What is the best way to proceed in order to migrate the databases/repository to 9.1? Can I move the repository folder to the new server, then during the LF Server install point to this repository folder and the existing 8.3.1 database and have them upgraded? (Similar for Workflow but without the repository, just the database.)
Thanks for the help.