I need to do a migration to new server and upgrade from 10.1 to 10.3 at the same time. The migration I can mostly figure out, however I have Avente, so my understanding is I will have to totally take down the old server and un-activate it before i can even begin the install of the new stuff. I also have all the workflow, web etc, so each of those will have to be done after the main LF server migration.
Is there an easier way to do this so that I can setup all the new stuff ahead of time? Like is there literally zero grace from LF on licensing for a migration when on Avente?