I’m trying to determine the best way to create a particular cutoff instruction. The cutoff instruction has two branches. The two branches deal with whether the protocol in question was completed or terminated.
If the protocol was completed there are two events, a 'Complete Date' and an 'FDAAA/IRB Complete date'. Both a Complete Date and an FDAAA/IRB Complete Date are required with a cutoff date of 5 years after the FDAAA/IRB date.
If the protocol is terminated there are 3 options ‘OEWG Terminated’, ‘Disapproved’ or ‘Withdrawn’. If any of these events happen the cutoff is 1 year rather than 5 years.
Is there is any way to create a cutoff instruction with an alternate instruction similar to what is available for a retention schedule or do we have to set up two separate cutoff instructions and switch the cutoff instruction to the terminated instruction if the protocol is terminated?
I was hoping to be able to tie the 2 cutoff instructions together somehow so the user would not have to hunt for the alternate cutoff instruction.